WHAT THE JOB INVOLVED

Trailing cable replacement on two separate lifts in a single day. The first was a single-phase lift with an inverter, the second a three-phase lift without. Both cables were inspected, removed, and replaced before functional testing and return to service. Both jobs finished ahead of schedule.

RESULT

Two lifts returned to service in a single day, both ahead of schedule.